Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 9 results ...
Birrell, G S (1985) General Contractors' Management: How Subs Evaluate IT. Journal of Construction Engineering and Management, 111(03), 244–59.
Easa, S M and Can, E K (1985) Optimization Model for Aggregate Blending. Journal of Construction Engineering and Management, 111(03), 216–30.
Kavanagh, D P (1985) Siren: A Repetitive Construction Simulation Model. Journal of Construction Engineering and Management, 111(03), 308–23.
Konon, W and Schuring, J R (1985) Vibration Criteria for Historic Buildings. Journal of Construction Engineering and Management, 111(03), 208–15.
McGartland, M R and Hendrickson, C T (1985) Expert Systems for Construction Project Monitoring. Journal of Construction Engineering and Management, 111(03), 293–307.
Nguyen, V U (1985) Tender Evaluation by Fuzzy Sets. Journal of Construction Engineering and Management, 111(03), 231–43.
- Type: Journal Article
- Keywords: Fuzzy sets; Bids; Contractors; Decision making;
- ISBN/ISSN: 0733-9364
- URL: https://doi.org/10.1061/(ASCE)0733-9364(1985)111:3(231)
- Abstract:
The process of evaluating tenders is considered to be largely dependent on subjective judgment when cost is not the only criterion used. A systematic procedure based on fuzzy set theory and multicriteria modeling is proposed for the selection of bid contracts. The proposed procedure is suitable for a general tender evaluation process that may involve many decision‐making parties and noninteractive multiple criteria. Illustrative examples are given for cases involving three major criteria: cost, present bid information, and past experience of tenderers.
Paulson, B C (1985) Automation and Robotics for Construction. Journal of Construction Engineering and Management, 111(03), 190–207.
Warszawski, A and Sangrey, D A (1985) Robotics in Building Construction. Journal of Construction Engineering and Management, 111(03), 260–80.
Wibby, R J (1985) Portland Cement Concrete Thin‐Bonded Overlay. Journal of Construction Engineering and Management, 111(03), 281–92.